The DRC has identified a portfolio of national and integrating priority projects spanning infrastructure, energy, mining & critical minerals, agriculture, logistics, digital transformation, and banking/financial services. These projects are curated by CAPUIDC (Cellule d’Appui à la Promotion des Investissements et au Développement des Conglomérats) under the DRC President’s Special Adviser Office in Charge of Investment.

Project categories

  • Infrastructure & Transport

    51 listed

    Roads, railways, ports, airports and urban mobility.

  • Energy

    16 listed

    Hydroelectric, grid modernization, substations and distribution.

  • Mining & Critical Minerals

    0 listed

    Copper, cobalt, lithium and rare-earth value chains.

  • Agriculture & Agro-Industry

    0 listed

    Value chains and logistics corridors.

  • Digital & Telecommunications

    0 listed

    Broadband, data centers and fintech.

  • Banking & Financial Services

    0 listed

    Microfinance and development banking.

  • Manufacturing & Industrial Zones

    4 listed

    Cement, special economic zones and industrial parks.

For investors

Each listing below shows the project name, sector segment, location, published investment cost, project stage, the implementing agency or sponsor, the government priority ranking, and how to submit an expression of interest. Return profiles are not published by the authorities and are therefore not shown; they must be established through your own diligence.

Showing 71 of 71 listings.

  • Manufacturing & Industrial Zones
    Cement industry
    Priority P1

    Renovation and extension of the Kabimba cement centre in Kalemie

    Location
    Kalemie, Tanganyika
    Investment (published)
    $235M
    Stage
    Study available
    Implementing agency
    Mixed / Government
    Horizon
    Short term
  • Manufacturing & Industrial Zones
    Cement industry
    Priority P1

    Renovation and extension of the Katana cement plant (grinding and silos)

    Location
    Bukavu, Sud-Kivu
    Investment (published)
    $40M
    Stage
    Study available
    Implementing agency
    Mixed Government / Interlacs GT
    Horizon
    Short term
  • Manufacturing & Industrial Zones
    Cement industry
    Priority P1

    Renovation of the Province Orientale cement plant in Kisangani

    Location
    Kisangani, Tshopo
    Investment (published)
    $280M
    Stage
    Study available
    Implementing agency
    Ministry of Industry
    Horizon
    Short term
  • Manufacturing & Industrial Zones
    Special economic zones
    Priority P1

    Implementation of a Special Economic Zone in Maluku

    Location
    Maluku, Kinshasa
    Investment (published)
    $220M
    Stage
    Study available
    Implementing agency
    Ministry of Industry
    Horizon
    Short term
  • Infrastructure & Transport
    Roads
    Priority P1

    RP 321 Batshamba–Gungu–Kabemba–Angola border (350 km)

    Location
    Kwilu
    Investment (published)
    $350M
    Stage
    Study available
    Implementing agency
    ATUHITPR
    Horizon
    Short term
    Ref. II.1.1.1 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of RN1 section Tshikapa–Kananga–Mbuji-Mayi (177 km)

    Location
    Kasaï / Kasaï-Central
    Investment (published)
    $437M
    Stage
    Study available
    Implementing agency
    ATUHITPR
    Horizon
    Short term
    Ref. II.1.1.2 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    RN2 section Mbuji-Mayi–Kasongo–Bukavu to Kigali and Bujumbura (958 km, earth road)

    Location
    Kasaï-Oriental to Sud-Kivu
    Investment (published)
    $958M
    Stage
    Study available
    Implementing agency
    ATUHITPR
    Horizon
    Short term
    Ref. II.1.1.3 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Rehabilitation of the Kavumu–Sake section

    Location
    Sud-Kivu / Nord-Kivu
    Investment (published)
    $290M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.4 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of the Bukavu–Goma–Butembo–Bunia–Kisangani road (1,700 km)

    Location
    Eastern DRC
    Investment (published)
    $1.70B
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.5 Express interest
  • Infrastructure & Transport
    Roads
    Priority P2

    Rehabilitation of RN3 section Kisangani–Walikale (400 km)

    Location
    Tshopo / Nord-Kivu
    Investment (published)
    $400M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Medium term
    Ref. II.1.1.6 Express interest
  • Infrastructure & Transport
    Roads
    Priority P2

    Walikale–Hombo road bituming (100 km)

    Location
    Nord-Kivu
    Investment (published)
    $100M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Medium term
    Ref. II.1.1.7 Express interest
  • Infrastructure & Transport
    Roads
    Priority P2

    Rehabilitation of the Hombo–Bukavu road (150 km)

    Location
    Sud-Kivu
    Investment (published)
    $150M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Medium term
    Ref. II.1.1.8 Express interest
  • Infrastructure & Transport
    Roads
    Priority P2

    Bituming of RN28 Rutshuru–Bunagana (24 km earth)

    Location
    Nord-Kivu
    Investment (published)
    $24M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Ref. II.1.1.9 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of RP 1029 Walikale–Masisi–Sake (288 km earth)

    Location
    Nord-Kivu
    Investment (published)
    $288M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.10 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of RN1 section Boma–Moanda (106 km)

    Location
    Kongo-Central
    Investment (published)
    $106M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.11 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Rehabilitation of RN1 section Boma–Matadi

    Location
    Kongo-Central
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.12 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Construction of the bridge over the Ubangi river

    Location
    Nord-Ubangi
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.13 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of RN5 section Kolwezi–Dilolo (426 km earth road)

    Location
    Lualaba
    Investment (published)
    $426M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.14 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of the Banana–Matadi section (133 km)

    Location
    Kongo-Central
    Investment (published)
    $130M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.15 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of the Lodja–Katakokombe–Kindu section

    Location
    Sankuru / Maniema
    Investment (published)
    $300M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.16 Express interest
  • Infrastructure & Transport
    Roads
    Priority P1

    Bituming of the Mbuji-Mayi–Lusambo section

    Location
    Kasaï-Oriental / Sankuru
    Investment (published)
    $320M
    Stage
    Study available
    Implementing agency
    Office des Routes
    Horizon
    Short term
    Ref. II.1.1.17 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Ndjili international airport

    Location
    Kinshasa
    Investment (published)
    $320M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.1 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Luano airport

    Location
    Lubumbashi, Haut-Katanga
    Investment (published)
    $48M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.2 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Bangoka airport

    Location
    Kisangani, Tshopo
    Investment (published)
    $48M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.3 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Kavumu airport

    Location
    Sud-Kivu
    Investment (published)
    $16.4M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.4 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Mbuji-Mayi airport

    Location
    Kasaï-Oriental
    Investment (published)
    $16.4M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.5 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Lusambo airport

    Location
    Sankuru
    Investment (published)
    $10M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.6 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Tshumbe airport

    Location
    Sankuru
    Investment (published)
    $10M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.7 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Lodja airport

    Location
    Sankuru
    Investment (published)
    $10M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.8 Express interest
  • Infrastructure & Transport
    Airports
    Priority P1

    Modernization of Tshikapa airport

    Location
    Kasaï
    Investment (published)
    $10M
    Stage
    Study available
    Implementing agency
    RVA
    Horizon
    Short term
    Ref. II.1.3.9 Express interest
  • Infrastructure & Transport
    Railways
    Priority P1

    Rehabilitation of the Matadi–Kinshasa railway

    Location
    Kongo-Central / Kinshasa
    Investment (published)
    $223.4M
    Stage
    Study available
    Implementing agency
    SCTP / MTVC
    Horizon
    Short term
    Ref. II.1.3R.1 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Inter-urban railway Central Station–Kinkole via Ndjili international airport

    Location
    Kinshasa
    Investment (published)
    $1.20B
    Stage
    Study available
    Implementing agency
    SCTP
    Horizon
    Medium term
    Ref. II.1.3R.2 Express interest
  • Infrastructure & Transport
    Railways
    Priority P1

    Rehabilitation of Kolwezi–Dilolo rail sections

    Location
    Lualaba
    Investment (published)
    $338M
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Short term
    Ref. II.1.3R.3 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Road/rail bridge construction Brazzaville–Kinshasa

    Location
    Kinshasa
    Investment (published)
    $413.7M
    Stage
    Study available
    Implementing agency
    Ministry of Planning
    Horizon
    Medium term
    Ref. II.1.3R.4 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Construction of the Kinshasa–Ilebo railway

    Location
    Kinshasa to Kasaï
    Investment (published)
    $19B
    Stage
    Study available
    Implementing agency
    Ministry of Planning
    Horizon
    Medium term
    Ref. II.1.3R.5 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Ilebo–Mwene-Ditu railway

    Location
    Kasaï / Lomami
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.6 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Double-tracking reliability of the Mwene-Ditu–Kamina railway

    Location
    Lomami / Haut-Lomami
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.7 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Double-tracking reliability of the Kamina–Kolwezi railway

    Location
    Haut-Lomami / Lualaba
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.8 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Double-tracking reliability of the Kolwezi–Lubumbashi railway

    Location
    Lualaba / Haut-Katanga
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.9 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Kolwezi–Dilolo railway

    Location
    Lualaba
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.10 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Lubumbashi–Sakania railway

    Location
    Haut-Katanga
    Investment (published)
    $400M
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.11 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Kamina–Kabalo railway

    Location
    Haut-Lomami / Tanganyika
    Investment (published)
    $250M
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.12 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Kabalo–Kalemie railway

    Location
    Tanganyika
    Investment (published)
    $300M
    Stage
    Study available
    Implementing agency
    SNCC
    Horizon
    Medium term
    Ref. II.1.3R.13 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Kabalo–Kindu railway

    Location
    Tanganyika / Maniema
    Investment (published)
    $272M
    Stage
    Study available
    Implementing agency
    CFUF
    Horizon
    Medium term
    Ref. II.1.3R.14 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Kisangani–Ubundu railway

    Location
    Tshopo
    Investment (published)
    $280M
    Stage
    Study available
    Implementing agency
    CFUF
    Horizon
    Medium term
    Ref. II.1.3R.15 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Construction of the Banana–Matadi railway (110 km)

    Location
    Kongo-Central
    Investment (published)
    $600M
    Stage
    Study available
    Implementing agency
    SCTP
    Horizon
    Medium term
    Ref. II.1.3R.16 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Construction of the Zongo–Bumba railway

    Location
    Sud-Ubangi / Mongala
    Investment (published)
    $1.20B
    Stage
    Study available
    Implementing agency
    CFUF
    Horizon
    Medium term
    Ref. II.1.3R.17 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Rehabilitation of the Bumba–Aketi–Bondo–Bula–Isiro railway

    Location
    Mongala to Haut-Uélé
    Investment (published)
    $1.50B
    Stage
    Study available
    Implementing agency
    CFUF
    Horizon
    Medium term
    Ref. II.1.3R.18 Express interest
  • Infrastructure & Transport
    Railways
    Priority P2

    Construction of the Isiro–Watsha–Bunia railway

    Location
    Haut-Uélé / Ituri
    Investment (published)
    $800M
    Stage
    Study available
    Implementing agency
    CFUF
    Horizon
    Medium term
    Ref. II.1.3R.19 Express interest
  • Infrastructure & Transport
    Ports & waterways
    Priority P1

    Rehabilitation and modernization of the port of Matadi

    Location
    Matadi, Kongo-Central
    Investment (published)
    $100.4M
    Stage
    Pre-feasibility study available
    Implementing agency
    SCTP / MTVC
    Horizon
    Short term
    Ref. II.1.4.1 Express interest
  • Infrastructure & Transport
    Ports & waterways
    Priority P1

    Acquisition of a floating dock

    Location
    Kongo-Central
    Investment (published)
    $20M
    Stage
    Pre-feasibility study available
    Implementing agency
    SCTP
    Horizon
    Short term
    Ref. II.1.4.2 Express interest
  • Infrastructure & Transport
    Ports & waterways
    Priority P1

    Acquisition of 2 dredgers for the Boma maritime reach

    Location
    Boma, Kongo-Central
    Investment (published)
    $50M
    Stage
    Study available
    Implementing agency
    CEPCOR
    Horizon
    Short term
    Ref. II.1.4.3 Express interest
  • Infrastructure & Transport
    Ports & waterways
    Priority P1

    Acquisition of 2 additional dredgers for the Boma maritime reach

    Location
    Boma, Kongo-Central
    Investment (published)
    $3M
    Stage
    Study available
    Implementing agency
    CEPCOR
    Horizon
    Short term
    Ref. II.1.4.4 Express interest
  • Infrastructure & Transport
    Ports & waterways

    Modernization of Kalundu harbour

    Location
    Uvira, Sud-Kivu
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNCC
    Ref. II.1.4.5 Express interest
  • Infrastructure & Transport
    Ports & waterways

    Construction of the Banana deep-water port

    Location
    Banana, Kongo-Central
    Investment (published)
    $540M
    Stage
    Study available
    Implementing agency
    OEBK
    Ref. II.1.4.6 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Construction of the 11,050 MW Inga 3 hydroelectric power plant

    Location
    Inga, Kongo-Central
    Investment (published)
    $17.90B
    Stage
    Feasibility study in progress
    Implementing agency
    ADPI
    Horizon
    Medium term
    Ref. II.2.1.1 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Rehabilitation of groups G23, G24, G25 and G26 of the Inga 2 plant

    Location
    Inga, Kongo-Central
    Investment (published)
    $227.2M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Short term
    Ref. II.2.1.2 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    400 kV line Kolwezi–Kamina–Mwene-Ditu–Mbuji-Mayi–Kananga and associated networks

    Location
    Lualaba to Kasaï-Central
    Investment (published)
    $1.47B
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.3 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Rehabilitation and reinforcement of the Inga plants and Kinshasa distribution network

    Location
    Inga / Kinshasa
    Investment (published)
    $479.2M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.4 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Construction of the Ruzizi 3 hydroelectric plant and associated networks

    Location
    Sud-Kivu
    Investment (published)
    $594M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.5 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Rehabilitation of the Bendera plant and associated transport line

    Location
    Tanganyika
    Investment (published)
    Cost to be confirmed
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.6 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Two 30 kV lines and two 30/15 kV–15 MVA substations at Musonoie and Metalkol-Kolwezi

    Location
    Kolwezi, Lualaba
    Investment (published)
    $4.5M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.7 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Two 30 kV–15 MVA lines and MV/LV networks at Joli-Site, Kolwezi

    Location
    Kolwezi, Lualaba
    Investment (published)
    $3.0M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.8 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Installation of 10 MV/LV cabins and low-voltage recovery in Kolwezi

    Location
    Kolwezi, Lualaba
    Investment (published)
    $0.9M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.9 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Installation of 5,000 prepaid meters in Kolwezi

    Location
    Kolwezi, Lualaba
    Investment (published)
    $2.1M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.10 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Rehabilitation and modernization of 11 substations in Kinshasa

    Location
    Kinshasa
    Investment (published)
    $121.7M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.11 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Rehabilitation of the Zongo 1 hydroelectric plant

    Location
    Kongo-Central
    Investment (published)
    $106.1M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.12 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Rehabilitation of group 3 of the Inga 1 hydroelectric plant

    Location
    Inga, Kongo-Central
    Investment (published)
    $45M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.13 Express interest
  • Energy
    Hydroelectric generation
    Priority P2

    Rehabilitation of group 4 of the Inga 2 hydroelectric plant

    Location
    Inga, Kongo-Central
    Investment (published)
    $55M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.14 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Construction of the 400 kV Inga and Kingatoko substations

    Location
    Kongo-Central
    Investment (published)
    $177.9M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.15 Express interest
  • Energy
    Transmission & distribution
    Priority P2

    Construction of the 120/15 kV–24 MVA Tabacongo substation and associated networks

    Location
    Kananga, Kasaï-Central
    Investment (published)
    $4.5M
    Stage
    Study available
    Implementing agency
    SNEL
    Horizon
    Medium term
    Ref. II.2.1.16 Express interest

Submit an expression of interest