DRC — National Priority & Banking Projects
Curated investment opportunities from the DRC President’s Special Adviser Office in Charge of Investment (CAPUIDC).
- Listings published
- 71
- Published cost of listings
- $55.92B
- Curating authority
- CAPUIDC
About
The DRC has identified a portfolio of national and integrating priority projects spanning infrastructure, energy, mining & critical minerals, agriculture, logistics, digital transformation, and banking/financial services. These projects are curated by CAPUIDC (Cellule d’Appui à la Promotion des Investissements et au Développement des Conglomérats) under the DRC President’s Special Adviser Office in Charge of Investment.
Project categories
Infrastructure & Transport
51 listedRoads, railways, ports, airports and urban mobility.
Energy
16 listedHydroelectric, grid modernization, substations and distribution.
Mining & Critical Minerals
0 listedCopper, cobalt, lithium and rare-earth value chains.
Agriculture & Agro-Industry
0 listedValue chains and logistics corridors.
Digital & Telecommunications
0 listedBroadband, data centers and fintech.
Banking & Financial Services
0 listedMicrofinance and development banking.
Manufacturing & Industrial Zones
4 listedCement, special economic zones and industrial parks.
For investors
Each listing below shows the project name, sector segment, location, published investment cost, project stage, the implementing agency or sponsor, the government priority ranking, and how to submit an expression of interest. Return profiles are not published by the authorities and are therefore not shown; they must be established through your own diligence.
Showing 71 of 71 listings.
- Manufacturing & Industrial ZonesCement industryPriority P1
Renovation and extension of the Kabimba cement centre in Kalemie
- Location
- Kalemie, Tanganyika
- Investment (published)
- $235M
- Stage
- Study available
- Implementing agency
- Mixed / Government
- Horizon
- Short term
Ref. I.1.1 Express interest - Manufacturing & Industrial ZonesCement industryPriority P1
Renovation and extension of the Katana cement plant (grinding and silos)
- Location
- Bukavu, Sud-Kivu
- Investment (published)
- $40M
- Stage
- Study available
- Implementing agency
- Mixed Government / Interlacs GT
- Horizon
- Short term
Ref. I.1.2 Express interest - Manufacturing & Industrial ZonesCement industryPriority P1
Renovation of the Province Orientale cement plant in Kisangani
- Location
- Kisangani, Tshopo
- Investment (published)
- $280M
- Stage
- Study available
- Implementing agency
- Ministry of Industry
- Horizon
- Short term
Ref. I.1.3 Express interest - Manufacturing & Industrial ZonesSpecial economic zonesPriority P1
Implementation of a Special Economic Zone in Maluku
- Location
- Maluku, Kinshasa
- Investment (published)
- $220M
- Stage
- Study available
- Implementing agency
- Ministry of Industry
- Horizon
- Short term
Ref. I.2.1 Express interest - Infrastructure & TransportRoadsPriority P1
RP 321 Batshamba–Gungu–Kabemba–Angola border (350 km)
- Location
- Kwilu
- Investment (published)
- $350M
- Stage
- Study available
- Implementing agency
- ATUHITPR
- Horizon
- Short term
Ref. II.1.1.1 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of RN1 section Tshikapa–Kananga–Mbuji-Mayi (177 km)
- Location
- Kasaï / Kasaï-Central
- Investment (published)
- $437M
- Stage
- Study available
- Implementing agency
- ATUHITPR
- Horizon
- Short term
Ref. II.1.1.2 Express interest - Infrastructure & TransportRoadsPriority P1
RN2 section Mbuji-Mayi–Kasongo–Bukavu to Kigali and Bujumbura (958 km, earth road)
- Location
- Kasaï-Oriental to Sud-Kivu
- Investment (published)
- $958M
- Stage
- Study available
- Implementing agency
- ATUHITPR
- Horizon
- Short term
Ref. II.1.1.3 Express interest - Infrastructure & TransportRoadsPriority P1
Rehabilitation of the Kavumu–Sake section
- Location
- Sud-Kivu / Nord-Kivu
- Investment (published)
- $290M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.4 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of the Bukavu–Goma–Butembo–Bunia–Kisangani road (1,700 km)
- Location
- Eastern DRC
- Investment (published)
- $1.70B
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.5 Express interest - Infrastructure & TransportRoadsPriority P2
Rehabilitation of RN3 section Kisangani–Walikale (400 km)
- Location
- Tshopo / Nord-Kivu
- Investment (published)
- $400M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Medium term
Ref. II.1.1.6 Express interest - Infrastructure & TransportRoadsPriority P2
Walikale–Hombo road bituming (100 km)
- Location
- Nord-Kivu
- Investment (published)
- $100M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Medium term
Ref. II.1.1.7 Express interest - Infrastructure & TransportRoadsPriority P2
Rehabilitation of the Hombo–Bukavu road (150 km)
- Location
- Sud-Kivu
- Investment (published)
- $150M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Medium term
Ref. II.1.1.8 Express interest - Infrastructure & TransportRoadsPriority P2
Bituming of RN28 Rutshuru–Bunagana (24 km earth)
- Location
- Nord-Kivu
- Investment (published)
- $24M
- Stage
- Study available
- Implementing agency
- Office des Routes
Ref. II.1.1.9 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of RP 1029 Walikale–Masisi–Sake (288 km earth)
- Location
- Nord-Kivu
- Investment (published)
- $288M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.10 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of RN1 section Boma–Moanda (106 km)
- Location
- Kongo-Central
- Investment (published)
- $106M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.11 Express interest - Infrastructure & TransportRoadsPriority P1
Rehabilitation of RN1 section Boma–Matadi
- Location
- Kongo-Central
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.12 Express interest - Infrastructure & TransportRoadsPriority P1
Construction of the bridge over the Ubangi river
- Location
- Nord-Ubangi
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.13 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of RN5 section Kolwezi–Dilolo (426 km earth road)
- Location
- Lualaba
- Investment (published)
- $426M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.14 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of the Banana–Matadi section (133 km)
- Location
- Kongo-Central
- Investment (published)
- $130M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.15 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of the Lodja–Katakokombe–Kindu section
- Location
- Sankuru / Maniema
- Investment (published)
- $300M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.16 Express interest - Infrastructure & TransportRoadsPriority P1
Bituming of the Mbuji-Mayi–Lusambo section
- Location
- Kasaï-Oriental / Sankuru
- Investment (published)
- $320M
- Stage
- Study available
- Implementing agency
- Office des Routes
- Horizon
- Short term
Ref. II.1.1.17 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Ndjili international airport
- Location
- Kinshasa
- Investment (published)
- $320M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.1 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Luano airport
- Location
- Lubumbashi, Haut-Katanga
- Investment (published)
- $48M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.2 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Bangoka airport
- Location
- Kisangani, Tshopo
- Investment (published)
- $48M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.3 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Kavumu airport
- Location
- Sud-Kivu
- Investment (published)
- $16.4M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.4 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Mbuji-Mayi airport
- Location
- Kasaï-Oriental
- Investment (published)
- $16.4M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.5 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Lusambo airport
- Location
- Sankuru
- Investment (published)
- $10M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.6 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Tshumbe airport
- Location
- Sankuru
- Investment (published)
- $10M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.7 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Lodja airport
- Location
- Sankuru
- Investment (published)
- $10M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.8 Express interest - Infrastructure & TransportAirportsPriority P1
Modernization of Tshikapa airport
- Location
- Kasaï
- Investment (published)
- $10M
- Stage
- Study available
- Implementing agency
- RVA
- Horizon
- Short term
Ref. II.1.3.9 Express interest - Infrastructure & TransportRailwaysPriority P1
Rehabilitation of the Matadi–Kinshasa railway
- Location
- Kongo-Central / Kinshasa
- Investment (published)
- $223.4M
- Stage
- Study available
- Implementing agency
- SCTP / MTVC
- Horizon
- Short term
Ref. II.1.3R.1 Express interest - Infrastructure & TransportRailwaysPriority P2
Inter-urban railway Central Station–Kinkole via Ndjili international airport
- Location
- Kinshasa
- Investment (published)
- $1.20B
- Stage
- Study available
- Implementing agency
- SCTP
- Horizon
- Medium term
Ref. II.1.3R.2 Express interest - Infrastructure & TransportRailwaysPriority P1
Rehabilitation of Kolwezi–Dilolo rail sections
- Location
- Lualaba
- Investment (published)
- $338M
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Short term
Ref. II.1.3R.3 Express interest - Infrastructure & TransportRailwaysPriority P2
Road/rail bridge construction Brazzaville–Kinshasa
- Location
- Kinshasa
- Investment (published)
- $413.7M
- Stage
- Study available
- Implementing agency
- Ministry of Planning
- Horizon
- Medium term
Ref. II.1.3R.4 Express interest - Infrastructure & TransportRailwaysPriority P2
Construction of the Kinshasa–Ilebo railway
- Location
- Kinshasa to Kasaï
- Investment (published)
- $19B
- Stage
- Study available
- Implementing agency
- Ministry of Planning
- Horizon
- Medium term
Ref. II.1.3R.5 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Ilebo–Mwene-Ditu railway
- Location
- Kasaï / Lomami
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.6 Express interest - Infrastructure & TransportRailwaysPriority P2
Double-tracking reliability of the Mwene-Ditu–Kamina railway
- Location
- Lomami / Haut-Lomami
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.7 Express interest - Infrastructure & TransportRailwaysPriority P2
Double-tracking reliability of the Kamina–Kolwezi railway
- Location
- Haut-Lomami / Lualaba
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.8 Express interest - Infrastructure & TransportRailwaysPriority P2
Double-tracking reliability of the Kolwezi–Lubumbashi railway
- Location
- Lualaba / Haut-Katanga
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.9 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Kolwezi–Dilolo railway
- Location
- Lualaba
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.10 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Lubumbashi–Sakania railway
- Location
- Haut-Katanga
- Investment (published)
- $400M
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.11 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Kamina–Kabalo railway
- Location
- Haut-Lomami / Tanganyika
- Investment (published)
- $250M
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.12 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Kabalo–Kalemie railway
- Location
- Tanganyika
- Investment (published)
- $300M
- Stage
- Study available
- Implementing agency
- SNCC
- Horizon
- Medium term
Ref. II.1.3R.13 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Kabalo–Kindu railway
- Location
- Tanganyika / Maniema
- Investment (published)
- $272M
- Stage
- Study available
- Implementing agency
- CFUF
- Horizon
- Medium term
Ref. II.1.3R.14 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Kisangani–Ubundu railway
- Location
- Tshopo
- Investment (published)
- $280M
- Stage
- Study available
- Implementing agency
- CFUF
- Horizon
- Medium term
Ref. II.1.3R.15 Express interest - Infrastructure & TransportRailwaysPriority P2
Construction of the Banana–Matadi railway (110 km)
- Location
- Kongo-Central
- Investment (published)
- $600M
- Stage
- Study available
- Implementing agency
- SCTP
- Horizon
- Medium term
Ref. II.1.3R.16 Express interest - Infrastructure & TransportRailwaysPriority P2
Construction of the Zongo–Bumba railway
- Location
- Sud-Ubangi / Mongala
- Investment (published)
- $1.20B
- Stage
- Study available
- Implementing agency
- CFUF
- Horizon
- Medium term
Ref. II.1.3R.17 Express interest - Infrastructure & TransportRailwaysPriority P2
Rehabilitation of the Bumba–Aketi–Bondo–Bula–Isiro railway
- Location
- Mongala to Haut-Uélé
- Investment (published)
- $1.50B
- Stage
- Study available
- Implementing agency
- CFUF
- Horizon
- Medium term
Ref. II.1.3R.18 Express interest - Infrastructure & TransportRailwaysPriority P2
Construction of the Isiro–Watsha–Bunia railway
- Location
- Haut-Uélé / Ituri
- Investment (published)
- $800M
- Stage
- Study available
- Implementing agency
- CFUF
- Horizon
- Medium term
Ref. II.1.3R.19 Express interest - Infrastructure & TransportPorts & waterwaysPriority P1
Rehabilitation and modernization of the port of Matadi
- Location
- Matadi, Kongo-Central
- Investment (published)
- $100.4M
- Stage
- Pre-feasibility study available
- Implementing agency
- SCTP / MTVC
- Horizon
- Short term
Ref. II.1.4.1 Express interest - Infrastructure & TransportPorts & waterwaysPriority P1
Acquisition of a floating dock
- Location
- Kongo-Central
- Investment (published)
- $20M
- Stage
- Pre-feasibility study available
- Implementing agency
- SCTP
- Horizon
- Short term
Ref. II.1.4.2 Express interest - Infrastructure & TransportPorts & waterwaysPriority P1
Acquisition of 2 dredgers for the Boma maritime reach
- Location
- Boma, Kongo-Central
- Investment (published)
- $50M
- Stage
- Study available
- Implementing agency
- CEPCOR
- Horizon
- Short term
Ref. II.1.4.3 Express interest - Infrastructure & TransportPorts & waterwaysPriority P1
Acquisition of 2 additional dredgers for the Boma maritime reach
- Location
- Boma, Kongo-Central
- Investment (published)
- $3M
- Stage
- Study available
- Implementing agency
- CEPCOR
- Horizon
- Short term
Ref. II.1.4.4 Express interest - Infrastructure & TransportPorts & waterways
Modernization of Kalundu harbour
- Location
- Uvira, Sud-Kivu
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNCC
Ref. II.1.4.5 Express interest - Infrastructure & TransportPorts & waterways
Construction of the Banana deep-water port
- Location
- Banana, Kongo-Central
- Investment (published)
- $540M
- Stage
- Study available
- Implementing agency
- OEBK
Ref. II.1.4.6 Express interest - EnergyHydroelectric generationPriority P2
Construction of the 11,050 MW Inga 3 hydroelectric power plant
- Location
- Inga, Kongo-Central
- Investment (published)
- $17.90B
- Stage
- Feasibility study in progress
- Implementing agency
- ADPI
- Horizon
- Medium term
Ref. II.2.1.1 Express interest - EnergyHydroelectric generationPriority P2
Rehabilitation of groups G23, G24, G25 and G26 of the Inga 2 plant
- Location
- Inga, Kongo-Central
- Investment (published)
- $227.2M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Short term
Ref. II.2.1.2 Express interest - EnergyTransmission & distributionPriority P2
400 kV line Kolwezi–Kamina–Mwene-Ditu–Mbuji-Mayi–Kananga and associated networks
- Location
- Lualaba to Kasaï-Central
- Investment (published)
- $1.47B
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.3 Express interest - EnergyTransmission & distributionPriority P2
Rehabilitation and reinforcement of the Inga plants and Kinshasa distribution network
- Location
- Inga / Kinshasa
- Investment (published)
- $479.2M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.4 Express interest - EnergyHydroelectric generationPriority P2
Construction of the Ruzizi 3 hydroelectric plant and associated networks
- Location
- Sud-Kivu
- Investment (published)
- $594M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.5 Express interest - EnergyHydroelectric generationPriority P2
Rehabilitation of the Bendera plant and associated transport line
- Location
- Tanganyika
- Investment (published)
- Cost to be confirmed
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.6 Express interest - EnergyTransmission & distributionPriority P2
Two 30 kV lines and two 30/15 kV–15 MVA substations at Musonoie and Metalkol-Kolwezi
- Location
- Kolwezi, Lualaba
- Investment (published)
- $4.5M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.7 Express interest - EnergyTransmission & distributionPriority P2
Two 30 kV–15 MVA lines and MV/LV networks at Joli-Site, Kolwezi
- Location
- Kolwezi, Lualaba
- Investment (published)
- $3.0M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.8 Express interest - EnergyTransmission & distributionPriority P2
Installation of 10 MV/LV cabins and low-voltage recovery in Kolwezi
- Location
- Kolwezi, Lualaba
- Investment (published)
- $0.9M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.9 Express interest - EnergyTransmission & distributionPriority P2
Installation of 5,000 prepaid meters in Kolwezi
- Location
- Kolwezi, Lualaba
- Investment (published)
- $2.1M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.10 Express interest - EnergyTransmission & distributionPriority P2
Rehabilitation and modernization of 11 substations in Kinshasa
- Location
- Kinshasa
- Investment (published)
- $121.7M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.11 Express interest - EnergyHydroelectric generationPriority P2
Rehabilitation of the Zongo 1 hydroelectric plant
- Location
- Kongo-Central
- Investment (published)
- $106.1M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.12 Express interest - EnergyHydroelectric generationPriority P2
Rehabilitation of group 3 of the Inga 1 hydroelectric plant
- Location
- Inga, Kongo-Central
- Investment (published)
- $45M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.13 Express interest - EnergyHydroelectric generationPriority P2
Rehabilitation of group 4 of the Inga 2 hydroelectric plant
- Location
- Inga, Kongo-Central
- Investment (published)
- $55M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.14 Express interest - EnergyTransmission & distributionPriority P2
Construction of the 400 kV Inga and Kingatoko substations
- Location
- Kongo-Central
- Investment (published)
- $177.9M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.15 Express interest - EnergyTransmission & distributionPriority P2
Construction of the 120/15 kV–24 MVA Tabacongo substation and associated networks
- Location
- Kananga, Kasaï-Central
- Investment (published)
- $4.5M
- Stage
- Study available
- Implementing agency
- SNEL
- Horizon
- Medium term
Ref. II.2.1.16 Express interest
Submit an expression of interest
Tell us which projects you are evaluating and the ticket size you can deploy. We route qualified expressions of interest to the relevant implementing agency and CAPUIDC contact point. An expression of interest is non-binding and creates no commitment.